| 24-05-2012 |
| Alvenius won the contract for a coated pipe system to Norra Länken, Stockholm, Sweden. A Total of 20 km of pipes and fittings. |
| 24-05-2012 |
| New project in Russia includes supply of 6 km of 80 bar pipes, mainly in diameter 10”, to supply water to the snowguns in Sochi, venue for the Olympics in 2014. The total length of Alvenius pipes in Sochi is now 30 km. |
| 02-01-2012 |
| Alvenius won the contract for the prestigious tunnel project Crossrail C300 in London, UK. A total of 72 km of pipes and fittings. |
Assembly without flame, or messy cutting oils and chips, and with a minimum of bolts, has great appeal for many users.
Alvenius pipe systems can be assembled with unskilled personnel and to that with a very short assembly time. The pipe systems require two bolts for each coupling (through 300 mm). Bolt hole alignment is not critical, as is the case with flanges.
The gaskets outer mating surface and the lips' inner mating surfaces are lightly greased with a lithium or silicon-based grease. The rubber gasket is slid onto one of the pipe ends.
Align the connecting pipe's end with a clearance of 2-3 mm. Slide the rubber gasket over the joint.
Fit the two halves of the coupling so that they enclose the gasket and the pipe ends.
Tighten the screws evenly and alternately.
Removing the weld crown on plain end pipes, SWE (pdf)
Removing the weld crown when fitting a Mech-T, (pdf)
Swedish
/ English
/ Norwegian
/ Danish
Repairing Alvenius Thermoplastic coated steel pipes, ENG (pdf) / SWE (pdf)